M/Y Eclipse
2018
162.5m
St Maarten
Selected Commissions
A curated record of vessels entrusted to Kraftworks International across the Mediterranean.
2018
162.5m
St Maarten
2021
43m
Port of Dénia
Full exterior refurbishment programme encompassing hull, topsides, and superstructure. Completed at the Port of Dénia over a twelve-week winter refit, returning the vessel to show condition ahead of the Mediterranean season.
2022
75m
Port of Marseille
Stack refinishing and fairing on this 75-metre Feadship, undertaken at the Port of Marseille. The communication tower and funnel casing were stripped, faired to original profile, and refinished in a matched topcoat system to exacting factory standards.
2023
48m
Antibes
Full topside refinishing programme including superstructure and hardtop. The owner specified a bespoke off-white formulation developed exclusively for this commission.
2025
80m
Tarragona
Various paintwork programme across hull, topsides, and superstructure on this 80-metre vessel, completed at Tarragona in 2025. Works encompassed surface preparation, fairing, and multi-coat topcoat application across all exterior painted surfaces.
2022
38m
Genoa
Application of advanced anti-fouling and anti-corrosion coatings to the underwater hull. Specialist primer system applied to address osmotic blistering identified during survey.
2022
72m
Monaco
Full hull repaint on one of the largest vessels in our portfolio. The 72-metre commission required a purpose-built scaffold system and a team of twelve specialist painters over six weeks.
2021
44m
Palma de Mallorca
Topside and superstructure refinishing following a season of charter use. Surfaces were stripped, faired, and refinished to a standard indistinguishable from new build.
Commission a Project
We work with a select number of owners each season. Enquire now to discuss your requirements.